Projects – شركة شمس السرى https://sas-sic.org شركة شمس السرى للتجارة والمقاولات العامة - العراق -بغداد Tue, 02 Apr 2024 07:04:05 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 https://sas-sic.org/wp-content/uploads/2022/05/Shms-Alsura-Badge-1-150x150.png Projects – شركة شمس السرى https://sas-sic.org 32 32 Damac Project https://sas-sic.org/portfolio/damac-project-2/ Mon, 06 Jun 2022 12:16:33 +0000 https://sas-sic.org/?post_type=portfolio&p=678

Damac Project

Our company is carrying out surveying, earthwork, civil, mechanical and electrical works for the largest residential investment project located near the main entrance to Baghdad International Airport for the construction of thousands of modern villas and service buildings. Our company, like the rest of the projects with its engineering, technical, administrative and logistical staff, is proud to implement such a residential project over a period of several years.

]]>
NIC Project https://sas-sic.org/portfolio/nic-project-2/ Mon, 06 Jun 2022 12:02:55 +0000 https://sas-sic.org/?post_type=portfolio&p=643

NIC Project

The housing complex project of the National Investment Commission (NIC).
This project is considered one of the modern residential projects for the construction of more than 250 residential houses at the lowest cost

]]>
Al Quds power plant https://sas-sic.org/portfolio/al-quds-power-plant/ Mon, 16 May 2022 12:54:43 +0000 https://sas-sic.org/?post_type=portfolio&p=407

Al Quds power plant

The project is located in the province of Baghdad/Rashidiya district, where the contract has been signed between our company and Baghdad Company for gas turbine units, to implementing of civil works in project. The production capacity of the power plant is 550 MW as of four units operation. Our company completed all mandated business successfully and according to slandered of procedures and regulations for the project.

]]>
Alhaidariya electric gas station https://sas-sic.org/portfolio/alhaidariya-electric-gas-station/ Mon, 16 May 2022 12:39:34 +0000 https://sas-sic.org/?post_type=portfolio&p=384

Alhaidariya electric gas station

The project is located in the province of Najaf, for the second time, our company has signed an agreement with Baghdad Company for gas turbine units to implement Alhaidariya electricity gas station project. The production capacity of the plant is 500 MW with four turbine gas units. Our company where implemented the civil works as follows:

● Excavate, bury and modify the site.
● Reinforcement processing and wooden mold for pouring.
● Processing and pumping concrete using our own equipment
(Batch plant, injection pumps and mixers).
● Examination and analysis of the company’s special laboratory in the same location.

Work still progressing on the project for being one of the major projects in central and southern parts of Iraq.

]]>
Al Wend Dam https://sas-sic.org/portfolio/al-wend-dam/ Thu, 12 May 2022 09:54:04 +0000 https://sas-sic.org/?post_type=portfolio&p=249

Al Wend Dam

The project is located in the province of Diala- Khanaqin district, where Al Rafidain Company for dams construction and at the behest of the Ministry of Water Resources to implementation of a dam on Al Wend river, where it was agreed between our company and Rafidain Company to implementing of the works as follows

● Water stream of the dam
The length of the water stream is 120 linear meters and height of the upper walls of 6 meters, where the company has implemented all carpentry and blacksmithing and processing concrete and water works fenders and a total amount of Concrete amounted to 3,620 cubic meters.
● Dam
Our company carried out work on the body of the dam as follows:
1. Dam Diaphragm longitudinal distance of 1,200 meters of
different depths from 1-28 meters along the stated
distance metric and a width of one meter.
2. The concrete injection works (plastic Concrete) for the
body of the dam and the total amount reached 4,134
cubic meters.
All works assigned to our company were completed successfully and according to the standard of procedures and controls.

]]>